What a properly commissioned system looks like

The install is finished. How do I know it was done properly?

Published 18/11/2026. Written by the Pristine Cooling team, Kalgoorlie.

Ask what was tested and what it read. A properly commissioned system comes with a record from the day it was started up, written down by whoever did the work. If the install finished with a handshake and no paperwork, you can't know it was done properly. Neither can the next technician who opens it up.

Installing a system is putting it in. Commissioning is proving it does what it was designed to do, in the space it's actually in, then writing that down. It happens before handover, not after the first complaint.

There isn't one checklist

There's no single list that covers commissioning. Every piece of equipment and every installation needs its own.

A wall split in a small office, a ducted system in a new build and a VRV system running across a whole floor are different jobs. A cool room is different again. It has to pull down to temperature with the door opening through the day. It has to defrost on a schedule that suits what's stored in it. More on that one in what a defrost cycle is and why yours might be wrong.

Each system is commissioned to what the manufacturer requires for that equipment. On a build it's also commissioned to the consulting engineer's drawings and specification. So the checks on one job are not the checks on the next, which is why you won't find a checklist on this page.

What doesn't change is what commissioning has to prove. The system is sealed. It has what it should have in it. It does the job it was put in to do, in the conditions it will actually run in. How that gets proven is different every time.

What we find when it wasn't done

The most common thing we find on a system someone else installed is a gas leak at the flares. A flare is the joint where the copper pipe connects to the unit. If it was made badly or never tested once it was done up, it leaks slowly. The system runs short of gas, works harder for less and eventually stops cooling. Topping it up doesn't fix it, which is covered in a split system blowing warm air.

The other is plain incorrect installation. We've been called to units hanging off the wall.

Both should have been caught before anyone packed up and left. A leaking flare found on the day is a quick fix before any gas has gone into the pipe. Found in February, it's a system that has been running short, a hot building and a repair on gear that's barely been used.

What you should get at handover

A properly finished install leaves you with paper as well as cold air.

That means a record of what was tested and what it read on the day. Drawings of what was actually installed and where. The operation and maintenance information for the equipment. Someone should also walk you through the controls on site and tell you who to ring when something changes.

If any of that is missing, ask for it now. It's much harder to get a month later, when the crew has moved on to the next job.

Why the record matters later

The readings taken on the day are the baseline. Two summers on, when a system isn't keeping up, the first thing a technician wants to know is what it read when it was new. With the commissioning record that's a comparison. Without it they're diagnosing from scratch.

It's also the starting point for looking after the plant. A system that goes onto preventative maintenance from handover gets checked against those first numbers. That's how drift gets caught before it turns into a breakdown.

How it runs on a build

On a commercial build we install and commission to the consulting engineer's drawings and specification. When the job's done, the client gets an operation manual with the final drawings and the commissioning data in it, plus a maintenance path from day one.

If you're a builder or a project manager, that's set out on the mechanical services page. The kind of buildings it's gone into is on our projects page.

If the system you've just had installed didn't come with any of this, ring (08) 9082 7134. We'll tell you straight whether it's worth having it looked over.

Ring us and we'll tell you when we can be there

Same number either way. Ring it if something is down right now or if you want a quote, a service or a maintenance contract set up.

Commercial breakdowns, any hour (08) 9082 7134
Email admin@pristinecooling.com.au
Call 24/7 Get a quote